







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Techo-Bloc Home Additions & ADU: The Sacramento Owner’s Guide
Techo-Bloc pavers, retaining walls, and architectural slabs hold up well in Sacramento’s summer heat, but when they’re part of a failed addition or ADU foundation, the fix is rarely a simple swap. In Sacramento, a Techo-Bloc home addition typically runs $45,000 – $130,000 installed, while a full ADU with Techo-Bloc hardscaping and foundation work lands between $90,000 – $220,000. Most owners don’t discover the problem until cracks show in the paver line, a corner of the slab starts sinking, or the door to the addition stops closing square because the grade shifted underneath. We stock Techo-Bloc-compatible materials on the truck and install them with the same discipline we bring to every structural job: a written price before work starts, no numbers that move at the door.
Bradford Remodeling Co Sacramento is an independent contractor. We install and repair Techo-Bloc products, but we’re not a Techo-Bloc corporate entity. That means we answer to one standard only: what holds up in Sacramento soil and Sacramento sun.
Which Techo-Bloc Models This Applies To

Techo-Bloc runs several product lines that show up in Sacramento additions and ADUs, and each has its own compatibility quirks. The big three we handle for home additions and ADU work are:
- Blu 60 mm and Blu 80 mm slabs – popular for backyard ADU walkways and patio tie-ins. The 80 mm version is rated for heavier foot traffic and occasional light vehicle use; the 60 mm is not. If a previous contractor laid 60 mm where an ADU driveway or side path now carries golf carts, motorcycles, or a small trailer, the slabs crack at the edges first.
- Raffinato and Villagio pavers – the most common Techo-Bloc pavers we see in Sacramento additions. Both come in modular bundles, but the joint widths are different. Raffinato runs tighter joints (about 1/8 inch), Villagio wider (up to 3/8 inch). Mixing them on the same project without accounting for joint spacing throws the whole pattern off.
- Prescott and Semma retaining wall blocks – used for grade changes under additions or around ADU foundations. These are pinned systems; if the geogrid wasn’t installed correctly behind the wall, the freeze-thaw cycles we get in Sacramento winters (mild, yes, but real) will push the face out a half-inch a year until something gives.
The compatibility gotcha on every Techo-Bloc addition job is the base. Techo-Bloc’s own installation spec calls for a specific depth of compacted aggregate depending on soil type. Sacramento’s clay-heavy soils in areas like Pocket-Greenhaven, Land Park, and East Sacramento hold water differently than the sandier soil out toward Folsom. If the base wasn’t compacted in lifts or the fabric separator was skipped, the stones move. Matching the part is easy. Matching what’s underneath it is where the skill lives.
For aftermarket versus OEM: Techo-Bloc pavers and slabs are proprietary blends. Generic big-box pavers won’t match the color blend, the chamfer profile, or the joint spacing. We recommend OEM Techo-Bloc materials for any visible surface. For hidden parts like base rock, geogrid, and drainage pipe, quality commercial-grade equivalents work fine and often cost less. We’ll show you the difference in the written estimate, line by line.
Styles & brands we work with







Signs Your Techo-Bloc Home Additions & ADU Is Failing
- Paver edges sagging or crowning near the addition’s foundation line. This usually means the base wasn’t compacted before the pavers went down, or the subgrade has settled unevenly. In Sacramento’s clay soil, water runs along the foundation and softens everything around it.
- Cracks running through the paver pattern in a straight line. A straight crack means the pavers are reflecting a crack in the concrete slab underneath. That’s structural, not cosmetic. A random, jagged crack is usually a point load or freeze damage.
- Water pooling against the addition wall or ADU corner after rain. Pavers slope the wrong way. Techo-Bloc calls for a 1.5% to 2% slope away from structures. If a crew laid them level or sloping toward the building, water sits there and works its way into the sill plate.
- Retaining wall blocks shifting or bulging outward. The geogrid wasn’t installed, or it wasn’t extended far enough back into the slope. Sacramento doesn’t get deep frost, but repeated wet-dry cycles in clay soil generate enough pressure to walk a wall forward over a few seasons.
- Gaps opening between pavers near the addition’s door thresholds. The subbase is washing out or settling where foot traffic concentrates. Every time someone steps through the door, the stones flex, and the gaps widen.
Any one of these means the base or substrate has a problem. The paver is just the part you can see.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Sacramento pricing for Techo-Bloc addition and ADU repair and replacement breaks down like this:
- Paver and slab replacement (labor + Techo-Bloc materials): $3,500 – $11,000 depending on square footage and access
- Full home addition with Techo-Bloc hardscape tie-in: $45,000 – $130,000
- ADU construction with Techo-Bloc foundation and hardscape: $90,000 – $220,000
- Garage conversion with Techo-Bloc exterior work: $30,000 – $80,000
- Retaining wall repair or rebuild with Techo-Bloc Prescott/Semma: $3,500 – $11,000
What drives the range: square footage, how much demo the old base requires, drainage corrections, and whether the soil under the pavers needs recompaction or replacement. Every bid from Bradford includes the parts line, the labor line, and the excavation and base prep line so you can see exactly where the money goes. No lump sums on the back of a business card.
Every Techo-Bloc repair and installation we complete carries the 365-Day Done Right Promise. If the pavers shift, the wall moves, or the slope fails within one year of the completion date, we return and correct it at no charge. That guarantee is in writing before the first shovel goes in the ground. Curtis Lane signs it himself.
We also install companion brands for additions and ADUs including KraftMaid cabinetry, Cambria and Silestone surfaces, with the same written price and warranty terms.
DIY or Call Us?
Here’s the honest split. You can safely inspect a failing Techo-Bloc installation. Walk the perimeter of your addition or ADU, look for gaps, cracks, pooling water, or wall lean. Take photos. Measure the gap widths. That helps you understand what you’re dealing with before you call.
What you shouldn’t do is pull up pavers and start re-laying them on your own, especially if the area carries foundation load or retains soil. A retaining wall that’s holding back three feet of Sacramento clay and starts to lean is under real pressure. Pull the wrong block and you can trigger a collapse. Same goes for pavers around an ADU foundation: the base is load-bearing in ways that aren’t obvious from the surface. If the substrate is compromised, any paver you set on it will fail again within two seasons.
We’re not going to tell you every Techo-Bloc repair needs a crew. Small things like resetting a few loose pavers on a flat patio can be a weekend job if the base is still sound. But if the problem is a slope, a wall, a foundation line, or anything structural, call us at (279) 226-1509. We’ll give you a straight answer and a written price. If it doesn’t need our crew, we’ll say so.
FAQs

Techo-Bloc pavers installed on a properly compacted base with correct drainage should last 25 to 30 years in Sacramento’s climate before the surface starts to lose color or texture, and the structural base should last longer than that. What fails first is almost never the paver itself – it’s the base, the drainage, or the geogrid behind a wall. We see 10-to-15-year-old Techo-Bloc installations in Sacramento failing because the original base was skimped, not because the product wore out. Call (279) 226-1509 and we’ll inspect what’s underneath before you spend money on new surface materials.
Yes, in most cases the repair is localized: we recompact or replace the base in the failing section, reset the pavers, and correct the drainage if the original slope was wrong. Full replacement only makes sense when the failure covers most of the surface or the wall has moved beyond what pins and geogrid can correct. The written estimate will show you the repair scope versus replacement cost so you can make the call with real numbers in front of you.
A localized paver reset or drainage correction typically takes one to three days, depending on access and how much base material needs to come out. A full wall rebuild with new geogrid and drainage can run a week to ten days. Additions and ADUs with Techo-Bloc hardscape integrated into the build timeline run months, not days, and we’ll give you a written schedule before work starts. Call (279) 226-1509 for an exact timeline on your project.
We keep common Techo-Bloc pavers, slabs, and wall blocks in local inventory and pull project-specific materials from Techo-Bloc’s Northern California distribution on a per-job basis, which means the color blend and batch match your existing installation. For older Techo-Bloc lines that have been discontinued, we can often source close-match replacements or rework the pattern to hide the transition. If you have a specific Techo-Bloc product and want to know if we can match it, call (279) 226-1509 with the product name and we’ll look it up while you’re on the phone.
Written by Curtis Lane, Owner, Bradford Remodeling Co Sacramento at Bradford Remodeling Co Sacramento, serving Sacramento and nearby areas.


